LEED-AP-ID-C 試験問題を無料オンラインアクセス
試験コード: | LEED-AP-ID-C |
試験名称: | LEED AP Interior Design + Construction (LEED AP ID+C) V4 |
認定資格: | USGBC |
無料問題数: | 100 |
更新日: | 2025-09-02 |
Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?
What strategy contributes to achievement of Materials and Resources Credit, Construction and Demolition Waste Management?
The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to
Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?
Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:
A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces
. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces
Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?