A contractor laid a water line too high, risking freezing and violating state laws. The contractor claims faulty plans from the client. They reach a voluntary settlement with a third party's help. What is this called?
For a signalized intersection, the critical lane volume is 1,500 vehicles/hour, and the saturation flow rate is
1,800 vehicles/hour/lane. What is the minimum green time required for a 90-second cycle with 4 seconds of lost time per phase?