C_TSCM42_66 試験問題を無料オンラインアクセス

試験コード:C_TSCM42_66
試験名称:SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6
認定資格:SAP
無料問題数:80
更新日:2025-08-21
評価
100%

問題 1

You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly
Which standard SAP material type do you use?

問題 2

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?

問題 3

During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs?(Choose two)

問題 4

Which types of objects can be changed with Engineering Change Management (ECM)?(Choose three)

問題 5

In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?

コメントを追加

あなたのメールアドレスが公開されることはありません。個人情報に関する内容は隠されます *

insert code
画面にある文字を入力してください。