C_DBADM_2601 試験問題を無料オンラインアクセス

試験コード:C_DBADM_2601
試験名称:SAP Certified - Database Administrator - SAP HANA
認定資格:SAP
無料問題数:217
更新日:2026-09-07
評価
100%

問題 1

CHALLENGE 2 - Traceability Workload Monitoring Baseline
The database team can either tune memory-related settings now to improve late-shift traceability reporting or first preserve baseline monitoring evidence and tune only if the evidence supports it. Which option is most defensible?

問題 2

A regional print services company is rehearsing a phased migration from SAP HANA on-premises to SAP HANA Cloud. The export completes, the target database is reachable, and database explorer confirms that sample queries return dat a. During review, the administrator finds that the rehearsal workbook does not include a comparison of administration checks between the source system before export and the cloud target after import. The project lead wants approval because the query results are correct.
The constraint is that the migration wave must prove operational transition readiness, not only data access. The validation pattern must show that source administration evidence and target administration evidence were captured at the correct points in the migration sequence.
Which recommendation is most appropriate?

問題 3

CHALLENGE 1 - Cutover Configuration Evidence Traceability
The upgraded reporting system and the installed validation database both pass connection checks. The upgraded system's configuration value exists in monitoring notes, while the validation database value exists in the administration record. Which validation sequence is most appropriate?

問題 4

A regional airport operator maintains SAP HANA for operational analytics while preparing an administration model that covers an on-premises database and an SAP HANA Cloud target. During a readiness review, SAP HANA cockpit confirms the on-premises database is available, while SAP HANA Cloud Central confirms that the cloud target is provisioned. However, the review evidence does not identify which environment owns backup monitoring, daily administration checks, or migration rehearsal validation.
The constraint is that the administrator must prevent unclear operational ownership before the next handover meeting. The team must keep both environments in scope without treating tool visibility as proof that administration responsibilities are correctly assigned.
Which action best addresses the ownership ambiguity?

問題 5

CHALLENGE 1 - First Close Configuration Traceability
During first close rehearsal, claims analytics reports load successfully from the upgraded SAP HANA system. The final administration record does not show whether the post-upgrade configuration adjustment was active during the rehearsal. What should the administrator do before accepting the close reporting evidence?

コメントを追加

あなたのメールアドレスが公開されることはありません。個人情報に関する内容は隠されます *

insert code
画面にある文字を入力してください。