C-TSCM42-67 試験問題を無料オンラインアクセス
| 試験コード: | C-TSCM42-67 |
| 試験名称: | SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| 認定資格: | SAP |
| 無料問題数: | 108 |
| 更新日: | 2026-08-28 |
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
Which of the following master data is necessary for the creation of material reservations for production orders?
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?