C-TS422-1809 試験問題を無料オンラインアクセス

試験コード:C-TS422-1809
試験名称:SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
認定資格:SAP
無料問題数:93
更新日:2026-08-27
評価
100%

問題 1

Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:

問題 2

The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:

問題 3

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:

問題 4

Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:

問題 5

To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer.
Response:

コメントを追加

あなたのメールアドレスが公開されることはありません。個人情報に関する内容は隠されます *

insert code
画面にある文字を入力してください。