1Z1-1002 試験問題を無料オンラインアクセス
| 試験コード: | 1Z1-1002 |
| 試験名称: | Oracle Manufacturing Cloud 2018 Implementation Essentials |
| 認定資格: | Oracle |
| 無料問題数: | 65 |
| 更新日: | 2026-09-16 |
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automatic work definition.
While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered = Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?