問題 1

Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

問題 2

You are in the process of defining a Standard Operation for visual inspection. You want the completion of this
standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

問題 3

The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not
getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

問題 4

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A
manufacturing engineer wants to generate a work definition automatically for some items, and wants to
eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

問題 5

The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.