問題 1

A Company has a policy that "Gas Leak" and "Repair" Activity Types must be scheduled immediately to the nearest field resource.
In addition, the company needs to ensure that the system routes gas leaks with a higher priority than repairs.
What configuration must be used to support this requirement?

問題 2

A customer requires that their dispatchers have the ability to modify activity start and end times for their technicians via the Core Manage interface when necessary.
Which option enables that ability?

問題 3

Your customer requires the option for supervisors to "supervise"Junior engineers as they are performing certain activities.
For this functionality, you have created a new "Supervision" internal activity to manually link these activities so they start at the same time by different resources.
Which option is a valid wayto configure this?

問題 4

Your customer wants help configuring a message scenario that, when launched, populates a proper* (A_TIME) with the time the message was created (message_time_of_creation).
What must be entered in the subject and body of the message pattern to support this requirement?

問題 5

The "Activity has not been started X minutes after ETA" display warning is set to 10 minutes. An activity's ETA is 9:00, the current time is 9:20 and the activity has not yet been started. Which warning will take place as a result of that configuration setting?