問題 1

A PV module is mounted with a 2-inch standoff from a shingle roof. What is the minimum clearance required for fire access per the International Fire Code (IFC)?

問題 2

A homeowner is concerned that a 6kWdc PV system might be experiencing a performance issue. The homeowner has noticed what appears to be declining production. The installer analyzes the following data acquisition system (DAS) results for each year since the installation:

Given the data, which is the MOST likely conclusion to draw?

問題 3

A site survey indicates a residential roof with a 4:12 pitch facing 20° east of south. The local latitude is 35°N, and the optimal tilt for maximum annual production is equal to latitude. What adjustment should be made to compensate for the roof's orientation and tilt to achieve near-optimal output?

問題 4

When doing initial inspections on a PV system that was installed using racking that is not compliant with UL.
2703, an inspector should pay special attention to which electrical attribute?

問題 5

A PV array is installed near a pool. What is the minimum distance required from the water's edge per NEC
690.31?