A new deployment area is planned with three 5.4 GHz sites. Each site will have a full cluster of six APs. Each AP is expected to average 5 Mbps downlink and 2 Mbps uplink loads. Three backhaul links are planned in a chain configuration (Network Operations
Center (NOC) to Site A, Site A to Site B, Site B to Site C). What is the minimum aggregate throughput required for the link from the NOC to Site A?
A customer is connecting three local retail outlet sites to their main office. Retail Sites A and B will each need 10 Mbps connections. Site C will need a 25 Mbps connection. The customer requires a wireless backhaul solution in a RING configuration for redundancy.
What is the minimum capacity of each wireless link?
In System Design, a high level conceptual diagram should include which of the following
(select TWO)?
Oceanside Information
The community of Oceanside is interested in obtaining a broadband access solution to all of the homes in the neighborhood. There is no fiber access in the neighborhood; however there is fiber near the entrance to the neighborhood on Highway A1A. The neighborhood association has requested that the proposal not have any tear-up of the existing roads.
The anticipated service area is approximately 1/2 x 1/3 miles.
Click on the Exhibit button to access the "Oceanside Map" and the "RFP Requirements"


Which of the following should be included in your acceptance testing criteria based upon the information provided (select TWO)?