問題 1

You are using the Microsoft Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template.
You are the scrum master.
You need to assign product requirements to an iteration.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

問題 2

Your network environment includes a single Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You are using the Default Template to build a solution that will be debugged by using IntelliTrace.
You need to ensure that symbols will be available to IntelliTrace for each build.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

問題 3

Your development team uses the Microsoft Visual Studio Scrum 2.0 process template. You are the scrum master.
The product owner has created product backlog items and assigned them to a release.
You need to work with the development team to estimate when the release will be completed.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

問題 4

Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A single build machine is installed with one controller and two agents. The working directories are configured to use the following working directory:
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath).
Your system drive is running out of space and some builds often fail with the following error:
"The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters."
You need to meet the following requirements:
- Point the working path to drive D.
- Construct a working directory that can be used to define the shortest unique path for each build agent it is used on.
What should you do?

問題 5

You are an automation engineer for your company. Your Scrum team is defining processes
for how your team should deliver products for product owner approval.
Your development team is deciding what the definition of done should be.
You need to contribute a test suite that will confirm each user story's level of done.
Which test should you perform?