Consider the following examples of risks identified in different software development projects
[1]. It may not be possible to generate the expected workloads to run performance tests, due to the poor hardware equipment of the machines (load injectors) that should generate these workloads.
[ii]. A user's session on a web application is not invalidated after a certain period of inactivity (configured by the system administrator) of the user,
[iii]. The test team will not have an adequate requirements specification (since many requirements will still be missing) by the time test design and analysis activities should begin according to the test plan.
[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and some data becomes corrupted.
Which of the following statements is TRUE?
An Incident Management tool implements the following defect states; Open, Assigned, Solved, Closed Consider the following defect report:
Id T000561
Test Object "Warehouse Management' application
Tester name; John Bishop
Date: 10th. April 2010
Test Case MRT558I
Status OPEN
Severity Serious
Priority
Problem- After inputting the Total Quantity item = 450 in the SV034 screen, the system shows an unexpected Error message=47 Correction:
Developer name:
Closing date:
Which of the following is a valid criticism of this report?