It is necessary to remove the fixed sheet metal parts of the compressor before installing the indoor unit in the air-cooled air conditioner.
In the process of disconnecting the battery pack switch, if there are multiple sets of batteries, first disconnect the main switch between the battery pack and the UPS, and then disconnect the switch of each battery pack.