HP0-J67 試験問題を無料オンラインアクセス
| 試験コード: | HP0-J67 |
| 試験名称: | Architecting Multi-site HP Storage Solutions |
| 認定資格: | HP |
| 無料問題数: | 121 |
| 更新日: | 2026-10-17 |
Refer to the scenario.
Which feature of the HP 3PAR StoreServ Storage system used in the solution allows the customer to meet technical goals while reducing capital expenses?
A leading automotive technology company wants to increase the performance and capacity of the storage infrastructure that supports the design and manufacture of its line of Formula 1 racing cars. The company is also interested in safe-guarding its mission-critical data and eliminating the threat of business disruption. Due to the massive engineering and technical effort required to create a new race car design and to enable regular delivery of upgraded parts to the race track while maintaining a competitive edge, it is necessary to have advanced applications running on a high-performance IT infrastructure. The company operates out of two data centers. The centers support a Plant Lifecycle Management database, an Enterprise Resource Planning (ERP) system, and various trackside systems to set up the race car and aid race strategy. In addition, the centers run applications for Computer-Aided Design (CAD) Computer-Aided Manufacturing (CAM), and Computational Fluid Dynamics (CFD) packages.
The company has deployed Oracle and SQL databases, VMware virtual machines, email, and all other applications on an HP 6400 Enterprise virtual Array (EVA). The EVAs automatically replicate between the two data centers to guard against failure. The EVAs are aging, applications are more sophisticated, data volumes have grown exponentially, and bottlenecks in the storage system are now having a significant effect on the performance of the simulation and analysis tools that are vital to the company's competitive position. The data storage problem has reached a point where the company is forced to store primary data at the secondary site causing the loss of their disaster recovery capability.
The company's top five IT Improvement goals are:
-Reduce complaints about storage system availability.
-increase support for sophisticated design and manufacturing applications.
-Provide a robust replication capability between data centers.
-increase storage utilization while deploying additional capacity.
-Simplify operations during peak workloads.
Moreover, the company's top three business benefit goals are:
-Ensure rapid data retrieval to aid in quick decision making.
-Protect mission-critical data and ensure business continuity.
-
Recover costs from existing infrastructure, thus providing increased IT funds for additional projects.
Your VMware customer has a requirement for transparent failover between campus data centers. Which HP 3PAR StoreServ feature enables the customer to fulfill this requirement?
Refer to the scenario.
A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.
The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.
The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend, the rerun could take up to 10 hours, even if just one job failed.
The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP
BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex10 10Gb Ethernet Modules as well as several HP ProLiant DL380 servers.
The company's top four IT improvements goals are as follows:
-replacing the aging robotic tape library
-enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)
-retaining more backup data in smaller disk space
-increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:
-increased confidence in disaster recovery
-minimal disruption by backups during regular business hours
-improved management of external audits
The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.
Based on the discussions with the client, you determine that the current DR strategy is not optimal. You want to propose a new layout that utilizes three data facilities, as shown in the exhibit.
How should you build the storage and backup based on this DR strategy?
You are performing a demo of an HP StoreOnce 2620i Backup System solution in combination with HP Data Protector. All best practice guidelines for the VTL and Data Protector have been adhered to. However, you receive the following error when formatting a cartridge in a previously-created VTL.
[Normal] From: [email protected] "Drive_Demo" Time: 4/23/2013 10:26:09 PM Tape0:0:0:0C
Initializing new medium: "[4E94F289] 4E94F289"
[Major] From: [email protected] "Drive_Demo" Time: 4/23/2013 10:26:10 PM [90:51]
Tape0:0:0:0C
Cannot write to device ([87] Wrong parameter.)
[Major] From: [email protected] "Drive_Demo" Time: 4/23/2013 10:26:10 PM
Initialization of medium failed.
[Normal] From [email protected] "Drive_Demo" Time: 4/23/2013 10:26:14 PM
Ejecting medium Tape0:0:0:0C".
What must you do to perform a successful demo?
Refer to the scenario.
A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.
The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.
The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend, the rerun could take up to 10 hours, even if just one job failed.
The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as several HP ProLiant DL380 servers.
The company's top four IT improvements goals are as follows:
-replacing the aging robotic tape library -enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)
-retaining more backup data in smaller disk space
-increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:
-increased confidence in disaster recovery
-minimal disruption by backups during regular business hours
-improved management of external audits
The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.
Which additional information do you require to validate the customer DR strategy? (Select two.)