問題 1

Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
a.Any deviation from the procedures described in the test
b.strategy document
c.The overall estimated costs, timescales and resource
d.requirements
e.A detailed schedule of testing activities
f.The development deliverables to be tested
g.Which test staff members (names) will be involved and when
h.Level of requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit

問題 2

Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits

問題 3

Acceptance test cases are based on what?

問題 4

Part of the testing strategy indicates that you are going to be using systematic test design techniques. Your manager has asked that you present the main advantages of using these techniques at the next board meeting. Identify THREE main benefits of using systematic test design techniques within this company. 2 credits (for 2 out of 3 correct 1 credit)

問題 5

In the MASPAR case study..?