D-PSC-DS-23 試験問題を無料オンラインアクセス

試験コード:D-PSC-DS-23
試験名称:Dell PowerScale Design 2023 Exam
認定資格:EMC
無料問題数:295
更新日:2026-01-03
評価
100%

問題 1

A company has data protection and recovery requirements that include:
- Point-in-time images of data
- Local data protection
- Directory level granularity
- Manual or scheduled operation
- Minimal storage to maintain
Which Isilon feature satisfies all requirements?

問題 2

We have been engaged by a research hospital to help upgrade their Isilon installation. They currently have 12 previous generation Isilon nodes with 200TB of capacity and run on a 1Gbps network. They currently have 6 IIlumina Hi-Seq Sequencers and an HPC cluster to process data.
They would like to expand Isilon to 2PB of active data and 1PB of archive data. They use a third party data and metadata management service (IRODs) to stage data for analysis. The Isilon cluster is mainly used for analysis work with the HPC cluster. The customer has a limited budget.
What would be the best price/performance solution for their active data?

問題 3

You need to gather information in order to design an Isilon solution.
What are included in the Top 10 qualification questions?

問題 4

Your customer manages a print media environment, consisting of three Isilon clusters, which are out of support. The customer would like to have access to new software releases and feature sets. You have been asked to perform a full discovery of the customer's environment.
The customer's current Isilon clusters are as follows:
"Cust" (12 x 12000X) serves as upload media storage for different tenants.
"Working" (8 x 12000X + 6 x X200) serves as a working zone for extraction to RAW and printing media from it.
"Archive" (16 x 72NL + Accelerator nodes) is used to store printed content for six months.
The customer operates in a Windows environment using SMB 2.0, two DNS servers per AD forest, three forest domains which are servicing three different environments. All servers are operating on a 1Gb network, three VLANs segregating the DEV/QA/PROD environments. Currently, there is no monitoring in place for performance measurement or optimization.
The requirements for this solution include:
- Better ROI and TCO
- Maintain same performance with possible improvements
- Renew HW/SW and get inclusive support
- Limit migrations
- Reduce space, power, cooling consumption
- Get new feature sets
- If migration required, use Parallel copy (multiple nodes, multiple threads multiple connections)
- Segregate tenant shares from other tenants
- Expand up to 1PB of total storage
Which licenses need to be defined for the solution to perform optimally?

問題 5

A customer has implemented snapshots on their PowerScale cluster. A UNIX administrator must recover data on one of their NFS attached file systems.
From which directory can they recover the data?

コメントを追加

あなたのメールアドレスが公開されることはありません。個人情報に関する内容は隠されます *

insert code
画面にある文字を入力してください。