In an oil and gas project, the location of a pile is offset by 78 mm north and 54 mm east of the key location plan. The location was stamped and issued for construction by a consulting engineering company. The statement on the drawings says, "Offset more than 75 mm is not accepted." Which of the following is the best approach for the civil engineering technologist to take?
What subsurface sampling would be most likely conducted during a preliminary site investigation for a proposed building?