L5M3 試験問題を無料オンラインアクセス
| 試験コード: | L5M3 |
| 試験名称: | Managing Contractual Risk |
| 認定資格: | CIPS |
| 無料問題数: | 118 |
| 更新日: | 2026-10-10 |
Which of the following are a suitable course of action to take in the event of a minor breach of a contract? Select TWO
Lollypop Manufacturer has a long standing contract with Retailer A.
They are three years into a five year contract and have been providing lollypops at 10p each since the beginning of the contract. Due to changes in the supply chain Lollypop Manufacturer would like a price increase. Can this be done?
Which of the following would be included in a contract to assign costs and responsibilities be-tween buyer and seller when products are delivered?