RCDDv14.1 試験問題を無料オンラインアクセス

試験コード:RCDDv14.1
試験名称:BICSI Registered Communications Distribution Designer
認定資格:BICSI
無料問題数:322
更新日:2025-09-04
評価
100%

問題 1

A new program component provides an opportunity to enhance program outcomes. What does the program manager use to document and monitor the opportunity'?

問題 2

An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building B. the designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building C. Both ends are terminated with SC connectors. What is the loss budget for the above fiber link?

問題 3

Alter an organization initiates a strategic program several project managers express interest in joining the program Team. The program manager's supervisor recommends a list of project managers to be part of the team What should the program manager do to select the project managers''

問題 4

The risk manager completes risk response planning. The risk manager believes that to effectively address all eventualities, an additional action is required.
What should the program manager do next?

問題 5

A program manager evaluates conflicting stakeholder demands associated with cost, schedule, and intended benefits. The implementation team has a strong interest in cost and schedule, and a limited interest in the benefits being produced. The client is only focused on benefits.
Which of the following actions should the program manager take?

コメントを追加

あなたのメールアドレスが公開されることはありません。個人情報に関する内容は隠されます *

insert code
画面にある文字を入力してください。