A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
Inthe pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements isTRUE?
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writingthe automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value
A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?