問題 1

A company has produced a new module. The failure data on 40 returns are shown below.

Which of the following is the first step in the review of this situation ?
Response:

問題 2

The optimum cost point for total life cycle costs occurs:
Response:

問題 3

The maintenance action rate (MAR) may be mandated by contract. If an extruder is run continuously and experiences 24 maintenance actions (downtown) in one year, what is the MAR?
Response:

問題 4

A high incidence of failures has developed during aircraft acceptance testing. The identified failure is that an instrument panel light has malfunctioned on 6 of the last 10 aircraft tested.
This problem needs to be investigated and a Failure Reporting and Corrective Action System (FRACAS) needs to be completed without stopping aircraft production.
If the cause of the failure is determined to be a faulty subassembly manufactured only by a single supplier, and this situation is threatening to shut down aircraft production, the next step should be to Response:

問題 5

An exclusive "or" gate produces an output only if: