CQE 試験問題を無料オンラインアクセス
| 試験コード: | CQE |
| 試験名称: | Certified Quality EngineerExam |
| 認定資格: | ASQ |
| 無料問題数: | 175 |
| 更新日: | 2026-10-19 |
A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of
If a quality engineer discovers a situation in which unlabeled finished product could be shipped to customers, what would be an appropriate preventive action to take?