CPIM-BSCM 試験問題を無料オンラインアクセス
| 試験コード: | CPIM-BSCM |
| 試験名称: | CPIM Basics of Supply Chain Management |
| 認定資格: | APICS |
| 無料問題数: | 155 |
| 更新日: | 2025-12-30 |
An extreme change in demand in the supply position upstream generated by a small change in demand
downstream in the supply chain is called the:
A manufacturer needs to monitor and balance the flow of work between work centers. Which of the
following techniques would address this need?