CEM 試験問題を無料オンラインアクセス
試験コード: | CEM |
試験名称: | Certified Energy Manager (CEM) |
認定資格: | AEE |
無料問題数: | 132 |
更新日: | 2025-10-19 |
You are using a performance contract to finance the added cost of using more-efficient equipment in the construction of a new building. Which of the following International Performance Measurement and Verification Protocol (IPMVP) options would you use to verify annual energy savings?
A facility has the thermal cooling load profile shown in the table below. The utility rate tariff has an on-peak time-of-use billing period that begins at 10:00 a.m. and ends at 7:00p.m. Calculate the storage capacity required for a load-shifting operating strategy, to make sure that no thermal cooling Is generated by the chiller during the on-peak utility rate period.
[Question from the previous image, which was about storage capacity for load shifting, but the table was missing]
What is the uniform series present worth factor (P/A, i%, n) for an annual interest rate of 15% and a lifetime of 20 years?