SUBCO is a potential concrete bridge contractor based in a metropolitan area 300 miles away from your project. They have offered to supply manpower and equipment t BILCO at a per diem rate of $3,000 above their direct labor and equipment rates. In doing a cost benefit analysis, which of the following is NOT a consideration?
Which of the following options is NOT a feasible method to reduce the overall completion time of the toll road program?
Which of the following are NOT considerations or constraints of the planning process for construction scheduling?